Duke Energy Florida, LLC is a 418.0 MW gas interconnection project in Levy, Florida with a current status of withdrawn. It is proposed to connect at Levy Substation.

418.0 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology

Project facts

Canonical nameDuke Energy Florida, LLC
Queue ID027328
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyGas
Capacity418.0 MW
StateFlorida
CountyLevy
Point of interconnectionLevy Substation
Requested (queue) date2008-03-06
Proposed in-service date2025-06-01
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.