Duke Energy Florida, LLC (196302)

Duke Energy Florida, LLC is a 74.9 MW solar interconnection project in Gilchrist, Florida with a current status of active. It is proposed to connect at Ginnie 69 kV Substation.

74.9 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nameDuke Energy Florida, LLC
Queue ID196302
Statusactive
Source statusDm e c ia O re n c
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyGilchrist
Point of interconnectionGinnie 69 kV Substation
Requested (queue) date2021-09-09
Proposed in-service date2024-08-28
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata