Duke Energy NA (G91)
Duke Energy NA is a 640.0 MW gas interconnection project in Deschutes, Oregon with a current status of withdrawn. It is proposed to connect at BPA's 230 kV transmission line between Redmond and Pilot Butte substations in Deschutes Co., OR.
640.0 MWCapacity
WithdrawnStatus
ORMarket
GasTechnology
Project facts
| Canonical name | Duke Energy NA |
|---|---|
| Queue ID | G91 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OR |
| Technology | Gas |
| Capacity | 640.0 MW |
| State | Oregon |
| County | Deschutes |
| Point of interconnection | BPA's 230 kV transmission line between Redmond and Pilot Butte substations in Deschutes Co., OR |
| Requested (queue) date | 2001-12-20 |
| Proposed in-service date | 2005-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Duke Energy Florida, LLC |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata