Duke Energy Progress, LLC (892419)

Duke Energy Progress, LLC is a 20.5 MW battery interconnection project in Person, North Carolina with a current status of withdrawn. It is proposed to connect at MAYO PLANT 230KV TAP LINE.

20.5 MWCapacity
WithdrawnStatus
NCMarket
BatteryTechnology

Project facts

Canonical nameDuke Energy Progress, LLC
Queue ID892419
Statuswithdrawn
Source statusWithdrawn
MarketNC
TechnologyBattery
Capacity20.5 MW
StateNorth Carolina
CountyPerson
Point of interconnectionMAYO PLANT 230KV TAP LINE
Requested (queue) date2023-05-25
Proposed in-service date
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata