Dutch Flat 2 (413_3P)

Dutch Flat 2 is a 27.3 MW other interconnection project in Nevada, California with a current status of operational.

27.3 MWCapacity
OperationalStatus
CISOMarket
OtherTechnology

Project facts

Canonical nameDutch Flat 2
Queue ID413_3P
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyOther
Capacity27.3 MW
StateCalifornia
CountyNevada
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1965-11-01
Withdrawn date
Developer
Utility / transmission ownerNevada Irrigation District

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata