E. Winamac - Monticello 138 kV line (J2798)

E. Winamac - Monticello 138 kV line is a 250.0 MW solar interconnection project in White, Indiana with a current status of withdrawn. It is proposed to connect at E. Winamac - Monticello 138 kV line.

250.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameE. Winamac - Monticello 138 kV line
Queue IDJ2798
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity250.0 MW
StateIndiana
CountyWhite
Point of interconnectionE. Winamac - Monticello 138 kV line
Requested (queue) date2022-09-15
Proposed in-service date2026-08-15
Operational date2026-08-15
Withdrawn date2023-03-24
Developer
Utility / transmission ownerNORTHERN INDIANA PUBLIC SERVICE COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata