Eagle Pass (3437_2)

Eagle Pass is a 3.2 MW other interconnection project in Maverick, Texas with a current status of operational.

3.2 MWCapacity
OperationalStatus
ERCOMarket
OtherTechnology

Project facts

Canonical nameEagle Pass
Queue ID3437_2
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyOther
Capacity3.2 MW
StateTexas
CountyMaverick
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1932-08-01
Withdrawn date
Developer
Utility / transmission ownerMaverick Cty Water Control & Improvement

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata