Eagle Pines Gas (18INR0009)

Eagle Pines Gas is a 1,173.5 MW gas interconnection project in Cherokee, Texas with a current status of operational. It is proposed to connect at tap 345kV 3109 Stryker - 3123 Trinidad.

1,173.5 MWCapacity
OperationalStatus
CherokeeMarket
GasTechnology

Project facts

Canonical nameEagle Pines Gas
Queue ID18INR0009
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCherokee
TechnologyGas
Capacity1,173.5 MW
StateTexas
CountyCherokee
Point of interconnectiontap 345kV 3109 Stryker - 3123 Trinidad
Requested (queue) date2015-03-30
Proposed in-service date
Operational date2028-10-30
Withdrawn date
DeveloperFGE Power
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata