Cherokee County, Texas — Interconnection Projects
The interXdata warehouse tracks 15 interconnection projects in Cherokee, Texas, representing 4,571 MW of requested capacity.
15Total projects
0Active
10Operational
5Withdrawn
4,571 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 7 | 4,210 MW |
| Solar | 1 | 200 MW |
| Other | 7 | 161 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| MISO Queue Project J480 — Gas in Cherokee, Texas | J480 | Gas | 1,240.0 MW | withdrawn | Cherokee, Texas |
| Eagle Pines Gas | 18INR0009 | Gas | 1,173.5 MW | operational | Cherokee, Texas |
| Stryker Creek | 3504_ST2 | Gas | 526.6 MW | operational | Cherokee, Texas |
| Ponta Power Plant | 20INR0224 | Gas | 484.0 MW | withdrawn | Cherokee, Texas |
| Ponta Power Station | 23INR0197 | Gas | 458.7 MW | withdrawn | Cherokee, Texas |
| Rusk - Crockett 345 kV Line | GEN-2024-155 | Solar | 200.0 MW | withdrawn | Cherokee, Texas |
| Stryker Creek | 3504_ST1 | Gas | 176.8 MW | operational | Cherokee, Texas |
| Altajac | 20INR0132 | Gas | 150.0 MW | withdrawn | Cherokee, Texas |
| Rogers Creek BESS | 25INR0414 | Other | 100.3 MW | operational | Cherokee, Texas |
| Lumberjack Storage | 23INR0324 | Other | 50.9 MW | operational | Cherokee, Texas |
| Stryker Creek | 3504_D5 | Other | 2.0 MW | operational | Cherokee, Texas |
| Stryker Creek | 3504_D2 | Other | 2.0 MW | operational | Cherokee, Texas |
| Stryker Creek | 3504_D4 | Other | 2.0 MW | operational | Cherokee, Texas |
| Stryker Creek | 3504_D3 | Other | 2.0 MW | operational | Cherokee, Texas |
| Stryker Creek | 3504_D1 | Other | 2.0 MW | operational | Cherokee, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| WattBridge Energy, LLC | 1 | 459 MW |
| FGE Power | 1 | 1,174 MW |
| Pro Energy Services LLC | 1 | 484 MW |
| Dialville BESS | 1 | 100 MW |
| EDP Renewables North America LLC | 1 | 51 MW |
| Alta Power LLC | 1 | 150 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.