Earlys 34.5 (AG1-085)

Earlys 34.5 is a 17.5 MW solar interconnection project in Hertford, North Carolina with a current status of withdrawn.

17.5 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameEarlys 34.5
Queue IDAG1-085
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity17.5 MW
StateNorth Carolina
CountyHertford
Point of interconnection—
Requested (queue) date2020-07-31
Proposed in-service date2021-12-31
Operational date—
Withdrawn date2021-10-08
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.