Ebony Energy Storage Repowering (24INR0635)

Ebony Energy Storage Repowering is a 5.0 MW battery interconnection project in Comal, Texas with a current status of operational.

5.0 MWCapacity
OperationalStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameEbony Energy Storage Repowering
Queue ID24INR0635
Statusoperational
Source statusoperational
MarketERCOT
TechnologyBattery
Capacity5.0 MW
StateTexas
CountyComal
Point of interconnection
Requested (queue) date2021-02-03
Proposed in-service date2024-04-29
Operational date2025-01-13
Withdrawn date
Developer
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata