EBONY SS - 5WM LEHI-W (J1857)

EBONY SS - 5WM LEHI-W is a 250.0 MW solar interconnection project in Cross, Arkansas with a current status of withdrawn. It is proposed to connect at EBONY SS - 5WM LEHI-W.

250.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameEBONY SS - 5WM LEHI-W
Queue IDJ1857
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity250.0 MW
StateArkansas
CountyCross
Point of interconnectionEBONY SS - 5WM LEHI-W
Requested (queue) date2021-11-17
Proposed in-service date2026-04-15
Operational date2026-04-15
Withdrawn date2025-03-07
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata