Cross County, Arkansas — Interconnection Projects

The interXdata warehouse tracks 19 interconnection projects in Cross, Arkansas, representing 2,688 MW of requested capacity.

19Total projects
1Active
6Operational
12Withdrawn
2,688 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar132,012 MW
Wind5666 MW
Battery110 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
AECC WYNNE EAST - PARKIN 161.0kVJ3570Solar300.0 MWwithdrawnCross, Arkansas
EBONY SS - 5WM LEHI-WJ1857Solar250.0 MWwithdrawnCross, Arkansas
ParkinJ2577Wind200.0 MWoperationalCross, Arkansas
AECC WYNNE EAST - PARKIN 161.0kVJ3783Solar200.0 MWwithdrawnCross, Arkansas
PARKIN - KUHN ROAD 161.0kVJ3606Solar197.7 MWwithdrawnCross, Arkansas
FISHER - CHERRY VALLEY 161.0kVJ3510Solar175.0 MWwithdrawnCross, Arkansas
TWIST - PARKIN 161.0kVJ3458Solar170.0 MWwithdrawnCross, Arkansas
WYNNE INDUSTRIALJ4036Solar160.0 MWwithdrawnCross, Arkansas
Crossover Wind67959_CWCPWind144.0 MWoperationalCross, Arkansas
FISHER - CHERRY VALLEY 161.0kVJ1816Solar135.0 MWoperationalCross, Arkansas
Cherry Valley PV I67992_CHVLYSolar135.0 MWoperationalCross, Arkansas
Quartz Solar, LLC67038_QRTZSolar135.0 MWoperationalCross, Arkansas
FORREST CITY N SS - WYNNE SOUTH 161.0kVJ1842Wind135.0 MWoperationalCross, Arkansas
FORREST CITY N SS - WYNNE SOUTH 161.0kVJ3814Wind135.0 MWwithdrawnCross, Arkansas
MISO Queue Project J677 — Solar in Cross, ArkansasJ677Solar100.0 MWwithdrawnCross, Arkansas
Forrest City to Wynne S 161 KV LineJ1841Wind52.0 MWwithdrawnCross, Arkansas
MISO Queue Project J689 — Solar in Cross, ArkansasJ689Solar50.0 MWwithdrawnCross, Arkansas
Wynne East to Wynne South 161kV line (J1125 sub)J1723Battery10.0 MWwithdrawnCross, Arkansas
SR Cherry Valley68097_CHERRSolar4.8 MWactiveCross, Arkansas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.