Echols Creek Storage (25INR0369)
Echols Creek Storage is a 100.6 MW other interconnection project in Lamar, Texas with a current status of suspended. It is proposed to connect at Tap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11770).
100.6 MWCapacity
SuspendedStatus
ERCOTMarket
OtherTechnology
Project facts
| Canonical name | Echols Creek Storage |
|---|---|
| Queue ID | 25INR0369 |
| Status | suspended |
| Source status | suspended |
| Market | ERCOT |
| Technology | Other |
| Capacity | 100.6 MW |
| State | Texas |
| County | Lamar |
| Point of interconnection | Tap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11770) |
| Requested (queue) date | 2023-04-06 |
| Proposed in-service date | 2027-10-13 |
| Operational date | — |
| Withdrawn date | — |
| Developer | BT Ferguson Solar, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata