EE Mansfield Center DG Cluster (1489)

EE Mansfield Center DG Cluster is a 10.8 MW solar+battery interconnection project in Tolland, Connecticut with a current status of withdrawn. It is proposed to connect at EE Mansfield 12J.

10.8 MWCapacity
WithdrawnStatus
CTMarket
Solar+BatteryTechnology

Project facts

Canonical nameEE Mansfield Center DG Cluster
Queue ID1489
Statuswithdrawn
Source statusW
MarketCT
TechnologySolar+Battery
Capacity10.8 MW
StateConnecticut
CountyTolland
Point of interconnectionEE Mansfield 12J
Requested (queue) date2024-01-17
Proposed in-service date2025-07-27
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata