Eiffel Solar (22INR0223)

Eiffel Solar is a 241.0 MW solar interconnection project in Lamar, Texas with a current status of operational. It is proposed to connect at POI changed to Double Tap 138kV 1693 Paris SW - 11770 Lamar Blossom Tap and 1693 Paris SW - 1768 Deport Rea.

241.0 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameEiffel Solar
Queue ID22INR0223
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity241.0 MW
StateTexas
CountyLamar
Point of interconnectionPOI changed to Double Tap 138kV 1693 Paris SW - 11770 Lamar Blossom Tap and 1693 Paris SW - 1768 Deport Rea
Requested (queue) date2019-07-10
Proposed in-service date2023-10-30
Operational date2023-11-30
Withdrawn date
DeveloperParis Farm Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata