Eiffel Solar II (23INR0438)

Eiffel Solar II is a 41.7 MW solar interconnection project in Lamar, Texas with a current status of withdrawn. It is proposed to connect at Double Tap 138kV:_x000D_ 1693 Paris SW - 11770 Lamar Blossom Ckt1_x000D_ 1693 Paris SW - 1768 Deport Rea Ckt1.

41.7 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameEiffel Solar II
Queue ID23INR0438
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity41.7 MW
StateTexas
CountyLamar
Point of interconnectionDouble Tap 138kV:_x000D_ 1693 Paris SW - 11770 Lamar Blossom Ckt1_x000D_ 1693 Paris SW - 1768 Deport Rea Ckt1
Requested (queue) date2022-01-05
Proposed in-service date2023-10-30
Operational date
Withdrawn date2022-10-03
DeveloperParis Farm Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.