Eiffel Solar II (23INR0438)
Eiffel Solar II is a 41.7 MW solar interconnection project in Lamar, Texas with a current status of withdrawn. It is proposed to connect at Double Tap 138kV:_x000D_ 1693 Paris SW - 11770 Lamar Blossom Ckt1_x000D_ 1693 Paris SW - 1768 Deport Rea Ckt1.
Project facts
| Canonical name | Eiffel Solar II |
|---|---|
| Queue ID | 23INR0438 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Solar |
| Capacity | 41.7 MW |
| State | Texas |
| County | Lamar |
| Point of interconnection | Double Tap 138kV:_x000D_ 1693 Paris SW - 11770 Lamar Blossom Ckt1_x000D_ 1693 Paris SW - 1768 Deport Rea Ckt1 |
| Requested (queue) date | 2022-01-05 |
| Proposed in-service date | 2023-10-30 |
| Operational date | — |
| Withdrawn date | 2022-10-03 |
| Developer | Paris Farm Solar, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata