El Zorro Storage (21INR0028)

El Zorro Storage is a 126.7 MW other interconnection project in Webb, Texas with a current status of withdrawn. It is proposed to connect at tap 138kV 80439 La Quinta - 8297 Bruni.

126.7 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameEl Zorro Storage
Queue ID21INR0028
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity126.7 MW
StateTexas
CountyWebb
Point of interconnectiontap 138kV 80439 La Quinta - 8297 Bruni
Requested (queue) date2018-06-28
Proposed in-service date2021-02-01
Operational date
Withdrawn date2020-09-01
DeveloperCypress Creek Renewables
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata