Eland Solar & Storage Center, Phase 2 Hy (61169_69SV8)

Eland Solar & Storage Center, Phase 2 Hy is a 308.0 MW solar interconnection project in Kern, California with a current status of operational.

308.0 MWCapacity
OperationalStatus
LDWPMarket
SolarTechnology

Project facts

Canonical nameEland Solar & Storage Center, Phase 2 Hy
Queue ID61169_69SV8
Statusoperational
Source status(OP) Operating
MarketLDWP
TechnologySolar
Capacity308.0 MW
StateCalifornia
CountyKern
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-07-01
Withdrawn date
Developer
Utility / transmission owner69SV 8me LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata