Eldora BESS (24INR0338)
Eldora BESS is a 201.3 MW other interconnection project in Matagorda, Texas with a current status of operational. It is proposed to connect at 345 kV South Texas Project (Bus# 5915) – Hillje (Bus# 44200) Transmission Line Ckt 1.
201.3 MWCapacity
OperationalStatus
MatagordaMarket
OtherTechnology
Project facts
| Canonical name | Eldora BESS |
|---|---|
| Queue ID | 24INR0338 |
| Status | operational |
| Source status | SS Completed, FIS Completed, IA |
| Market | Matagorda |
| Technology | Other |
| Capacity | 201.3 MW |
| State | Texas |
| County | Matagorda |
| Point of interconnection | 345 kV South Texas Project (Bus# 5915) – Hillje (Bus# 44200) Transmission Line Ckt 1 |
| Requested (queue) date | 2022-06-10 |
| Proposed in-service date | — |
| Operational date | 2028-07-02 |
| Withdrawn date | — |
| Developer | Eldora Energy LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata