Elk 138kV (AC1-194)

Elk 138kV is a 125.0 MW solar interconnection project in Vinton, Ohio with a current status of suspended.

125.0 MWCapacity
SuspendedStatus
—Market
SolarTechnology

Project facts

Canonical nameElk 138kV
Queue IDAC1-194
Statussuspended
Source statusSuspended
Market—
TechnologySolar
Capacity125.0 MW
StateOhio
CountyVinton
Point of interconnection—
Requested (queue) date2016-10-31
Proposed in-service date2027-01-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-03statusactivesuspendedhigh
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.