Vinton County, Ohio — Interconnection Projects
The interXdata warehouse tracks 9 interconnection projects in Vinton, Ohio, representing 1,196 MW of requested capacity.
9Total projects
1Active
6Operational
1Withdrawn
1,196 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 6 | 1,029 MW |
| Solar | 2 | 125 MW |
| Battery | 1 | 42 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Rolling Hills Generating | 55401_CT1 | Gas | 195.5 MW | operational | Vinton, Ohio |
| Rolling Hills Generating | 55401_CT4 | Gas | 195.5 MW | operational | Vinton, Ohio |
| Rolling Hills Generating | 55401_CT3 | Gas | 195.5 MW | operational | Vinton, Ohio |
| Rolling Hills Generating | 55401_CT5 | Gas | 195.5 MW | operational | Vinton, Ohio |
| Rolling Hills Generating | 55401_CT2 | Gas | 195.5 MW | operational | Vinton, Ohio |
| Elk 138kV | AC1-194 | Solar | 125.0 MW | active | Vinton, Ohio |
| Flatlick 765 kV | AF2-395 | Gas | 51.1 MW | operational | Vinton, Ohio |
| Elk 138 kV | AE1-093 | Battery | 42.0 MW | suspended | Vinton, Ohio |
| Elk 138 kV | AI2-157 | Solar | 0.0 MW | withdrawn | Vinton, Ohio |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Vinton County.
Start tracking with interXdata