Emerald Hill Energy Storage is a 261.0 MW battery interconnection project in Dallas, Texas with a current status of withdrawn. It is proposed to connect at Desoto Switch (2431) - Cedar Hill Switch (2420) 345kV Line.

261.0 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameEmerald Hill Energy Storage
Queue ID25INR0363
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity261.0 MW
StateTexas
CountyDallas
Point of interconnectionDesoto Switch (2431) - Cedar Hill Switch (2420) 345kV Line
Requested (queue) date2023-02-26
Proposed in-service date2027-06-30
Operational date
Withdrawn date2025-07-24
DeveloperEmerald Hill Energy Storage LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.