Energy Storage (752)

Energy Storage is a 102.8 MW battery interconnection project in Bristol, Massachusetts with a current status of withdrawn. It is proposed to connect at Eversource 115kV Cross Road Substation [both buses at Cross Road Substation (bus/line 111 = primary; bus/line 109 = alternate)].

102.8 MWCapacity
WithdrawnStatus
SEMAMarket
BatteryTechnology

Project facts

Canonical nameEnergy Storage
Queue ID752
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyBattery
Capacity102.8 MW
StateMassachusetts
CountyBristol
Point of interconnectionEversource 115kV Cross Road Substation [both buses at Cross Road Substation (bus/line 111 = primary; bus/line 109 = alternate)]
Requested (queue) date2018-04-19
Proposed in-service date2022-05-02
Operational date
Withdrawn date2019-05-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata