Estacado Solar (17INR0030)

Estacado Solar is a 100.0 MW solar interconnection project in Deaf Smith, Texas with a current status of withdrawn. It is proposed to connect at 79502 Windmill 345kV.

100.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameEstacado Solar
Queue ID17INR0030
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity100.0 MW
StateTexas
CountyDeaf Smith
Point of interconnection79502 Windmill 345kV
Requested (queue) date2015-05-11
Proposed in-service date2019-12-31
Operational date
Withdrawn date2019-01-24
DeveloperAvangrid Power, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata