ETIWANDA SCGT EXPANSION (141)

ETIWANDA SCGT EXPANSION is a 504.0 MW gas interconnection project in San Bernardino, California with a current status of withdrawn. It is proposed to connect at Rancho Vista 500 kV Substation.

504.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameETIWANDA SCGT EXPANSION
Queue ID141
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologyGas
Capacity504.0 MW
StateCalifornia
CountySan Bernardino
Point of interconnectionRancho Vista 500 kV Substation
Requested (queue) date2006-11-03
Proposed in-service date—
Operational date—
Withdrawn date2007-12-11
Developer—
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.