Evans Creek Energy Storage (26INR0260)

Evans Creek Energy Storage is a 103.0 MW other interconnection project in Val Verde, Texas with a current status of operational. It is proposed to connect at Comstock 138kV Substation (PSSE Bus #8683).

103.0 MWCapacity
OperationalStatus
Val VerdeMarket
OtherTechnology

Project facts

Canonical nameEvans Creek Energy Storage
Queue ID26INR0260
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketVal Verde
TechnologyOther
Capacity103.0 MW
StateTexas
CountyVal Verde
Point of interconnectionComstock 138kV Substation (PSSE Bus #8683)
Requested (queue) date2023-10-25
Proposed in-service date
Operational date2028-04-01
Withdrawn date
DeveloperEvans Creek Energy Storage LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata