Evans Creek Energy Storage Project (68334_EVCRK)

Evans Creek Energy Storage Project is a 103.0 MW battery interconnection project in Val Verde, Texas with a current status of active.

103.0 MWCapacity
ActiveStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameEvans Creek Energy Storage Project
Queue ID68334_EVCRK
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketERCO
TechnologyBattery
Capacity103.0 MW
StateTexas
CountyVal Verde
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-07-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerEvans Creek Energy Storage LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-02proposed_online_date2026-06-012026-07-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-09-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata