EVERGREEN RIDGE POWER is a 624.0 MW gas interconnection project in Tioga, Pennsylvania with a current status of active. It is proposed to connect at Mainesburg 345 kV to Homer City 345 kV Circuit ID -1.
624.0 MWCapacity
ActiveStatus
CMarket
GasTechnology
Project facts
| Canonical name | EVERGREEN RIDGE POWER |
|---|---|
| Queue ID | C26-0001 |
| Status | active |
| Source status | 1 |
| Market | C |
| Technology | Gas |
| Capacity | 624.0 MW |
| State | Pennsylvania |
| County | Tioga |
| Point of interconnection | Mainesburg 345 kV to Homer City 345 kV Circuit ID -1 |
| Requested (queue) date | 2026-07-31 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Evergreen Wind, LLC |
| Utility / transmission owner | NYSEG |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-12 | new_project | — | active | high |
Explore related data
Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata