Eversource Group @ Fisher Rd Substation 657 (999)

Eversource Group @ Fisher Rd Substation 657 is a 27.9 MW solar+battery interconnection project in Bristol, Massachusetts with a current status of withdrawn. It is proposed to connect at Eversource Fisher Rd 657.

27.9 MWCapacity
WithdrawnStatus
SEMAMarket
Solar+BatteryTechnology

Project facts

Canonical nameEversource Group @ Fisher Rd Substation 657
Queue ID999
Statuswithdrawn
Source statusW
MarketSEMA
TechnologySolar+Battery
Capacity27.9 MW
StateMassachusetts
CountyBristol
Point of interconnectionEversource Fisher Rd 657
Requested (queue) date2020-04-09
Proposed in-service date2023-11-30
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.