Eversource Group Study @ Crystal Spring (975)
Eversource Group Study @ Crystal Spring is a 20.5 MW solar+battery interconnection project in Plymouth, Massachusetts with a current status of withdrawn. It is proposed to connect at Eversource Crystal Spring 646.
20.5 MWCapacity
WithdrawnStatus
SEMAMarket
Solar+BatteryTechnology
Project facts
| Canonical name | Eversource Group Study @ Crystal Spring |
|---|---|
| Queue ID | 975 |
| Status | withdrawn |
| Source status | W |
| Market | SEMA |
| Technology | Solar+Battery |
| Capacity | 20.5 MW |
| State | Massachusetts |
| County | Plymouth |
| Point of interconnection | Eversource Crystal Spring 646 |
| Requested (queue) date | 2020-03-25 |
| Proposed in-service date | 2023-11-30 |
| Operational date | — |
| Withdrawn date | 2025-06-13 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata