Eversource Group Study @ Wing Lane (978)

Eversource Group Study @ Wing Lane is a 5.1 MW solar interconnection project in Bristol, Massachusetts with a current status of withdrawn. It is proposed to connect at Eversource Wing Lane 624.

5.1 MWCapacity
WithdrawnStatus
SEMAMarket
SolarTechnology

Project facts

Canonical nameEversource Group Study @ Wing Lane
Queue ID978
Statuswithdrawn
Source statusW
MarketSEMA
TechnologySolar
Capacity5.1 MW
StateMassachusetts
CountyBristol
Point of interconnectionEversource Wing Lane 624
Requested (queue) date2020-03-25
Proposed in-service date2023-11-30
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata