Falcon II Solar (28INR0482)

Falcon II Solar is a 100.3 MW solar interconnection project in Zapata, Texas with a current status of operational. It is proposed to connect at 8004 Revilla 138 kV.

100.3 MWCapacity
OperationalStatus
ZapataMarket
SolarTechnology

Project facts

Canonical nameFalcon II Solar
Queue ID28INR0482
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketZapata
TechnologySolar
Capacity100.3 MW
StateTexas
CountyZapata
Point of interconnection8004 Revilla 138 kV
Requested (queue) date2026-03-29
Proposed in-service date
Operational date2032-02-16
Withdrawn date
DeveloperFalcon Energy Project, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata