Fallbrook Energy Storage (61365_FBES)

Fallbrook Energy Storage is a 40.0 MW battery interconnection project in San Diego, California with a current status of operational.

40.0 MWCapacity
OperationalStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameFallbrook Energy Storage
Queue ID61365_FBES
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyBattery
Capacity40.0 MW
StateCalifornia
CountySan Diego
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2023-03-01
Withdrawn date—
Developer—
Utility / transmission ownerSan Diego Gas & Electric Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata