Farmersville West BESS 2 (23INR0618)

Farmersville West BESS 2 is a 9.9 MW battery interconnection project in Collin, Texas with a current status of operational. It is proposed to connect at Station Name: Farmersville West TNP Substation_x000D_ Station Code: FRMRSVLW_x000D_ PTI Bus#: 37291_x000D_ Load Transformer Name: FRMVW_3_x000D_ Transmission Level Voltage: 138 kV.

9.9 MWCapacity
OperationalStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameFarmersville West BESS 2
Queue ID23INR0618
Statusoperational
Source statusoperational
MarketERCOT
TechnologyBattery
Capacity9.9 MW
StateTexas
CountyCollin
Point of interconnectionStation Name: Farmersville West TNP Substation_x000D_ Station Code: FRMRSVLW_x000D_ PTI Bus#: 37291_x000D_ Load Transformer Name: FRMVW_3_x000D_ Transmission Level Voltage: 138 kV
Requested (queue) date2023-06-14
Proposed in-service date2024-11-30
Operational date2025-02-20
Withdrawn date
DeveloperSBESS TX 3, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata