Farmersville West BESS 2 (23INR0618)
Farmersville West BESS 2 is a 9.9 MW battery interconnection project in Collin, Texas with a current status of operational. It is proposed to connect at Station Name: Farmersville West TNP Substation_x000D_ Station Code: FRMRSVLW_x000D_ PTI Bus#: 37291_x000D_ Load Transformer Name: FRMVW_3_x000D_ Transmission Level Voltage: 138 kV.
Project facts
| Canonical name | Farmersville West BESS 2 |
|---|---|
| Queue ID | 23INR0618 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | Texas |
| County | Collin |
| Point of interconnection | Station Name: Farmersville West TNP Substation_x000D_ Station Code: FRMRSVLW_x000D_ PTI Bus#: 37291_x000D_ Load Transformer Name: FRMVW_3_x000D_ Transmission Level Voltage: 138 kV |
| Requested (queue) date | 2023-06-14 |
| Proposed in-service date | 2024-11-30 |
| Operational date | 2025-02-20 |
| Withdrawn date | — |
| Developer | SBESS TX 3, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata