Felix North Solar Placeholder (27INR0599)

Felix North Solar Placeholder is a 201.0 MW solar interconnection project in Wilbarger, Texas with a current status of withdrawn. It is proposed to connect at 345 kV Riley Substation (#6101).

201.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameFelix North Solar Placeholder
Queue ID27INR0599
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity201.0 MW
StateTexas
CountyWilbarger
Point of interconnection345 kV Riley Substation (#6101)
Requested (queue) date
Proposed in-service date2027-07-31
Operational date
Withdrawn date2025-11-24
DeveloperFelix 1, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata