Fence Post Solar (22INR0404)

Fence Post Solar is a 237.3 MW solar interconnection project in Navarro, Texas with a current status of operational. It is proposed to connect at tap 138kV 3127 Trinidad – 3483 Goodloe.

237.3 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameFence Post Solar
Queue ID22INR0404
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity237.3 MW
StateTexas
CountyNavarro
Point of interconnectiontap 138kV 3127 Trinidad – 3483 Goodloe
Requested (queue) date2020-11-04
Proposed in-service date2025-02-21
Operational date2025-02-13
Withdrawn date
DeveloperFence Post Solar Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata