Field Day Solar (C24-120)

Field Day Solar is a 300.0 MW solar+battery interconnection project in Oneida, New York with a current status of withdrawn. It is proposed to connect at Boonville to Rome 115KV Line 3.

300.0 MWCapacity
WithdrawnStatus
NYISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameField Day Solar
Queue IDC24-120
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar+Battery
Capacity300.0 MW
StateNew York
CountyOneida
Point of interconnectionBoonville to Rome 115KV Line 3
Requested (queue) date2024-09-03
Proposed in-service date
Operational date
Withdrawn date
DeveloperField Day Solar Project, LLC
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata