Five Points Pipeline (69900_26818)

Five Points Pipeline is a 4.1 MW solar interconnection project in Fresno, California with a current status of operational.

4.1 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameFive Points Pipeline
Queue ID69900_26818
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity4.1 MW
StateCalifornia
CountyFresno
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-12-01
Withdrawn date—
Developer—
Utility / transmission ownerMaas Energy Works

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata