Maas Energy Works — Interconnection Queue Projects
Maas Energy Works is associated with 6 tracked interconnection projects representing 17 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
6Projects
0Active
6Operational
0Withdrawn
17 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 6 | 17 MW |
Geographic footprint
| State | Projects |
|---|---|
| California | 6 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Merced Pipeline | 69899_24813 | Solar | 4.1 MW | operational | Merced, California |
| Lakeside Pipeline | 69898_25812 | Solar | 4.1 MW | operational | Kings, California |
| Five Points Pipeline | 69900_26818 | Solar | 4.1 MW | operational | Fresno, California |
| Van der Hoek Solar Array/ Dairy | 64687_VDH | Solar | 2.4 MW | operational | Fresno, California |
| Five H Farms Solar Array | 65168_FHF | Solar | 1.0 MW | operational | Merced, California |
| Van der Kooi Dairy Solar Array | 65169_VDK | Solar | 1.0 MW | operational | Fresno, California |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Maas Energy Works.
Start tracking with interXdata