Fivemile Wind (27INR0474)

Fivemile Wind is a 282.3 MW other interconnection project in Dawson, Texas with a current status of operational. It is proposed to connect at Tap 138kV Lamesa 138kv (10008) to Jim Payne 138kV (18880) .

282.3 MWCapacity
OperationalStatus
DawsonMarket
OtherTechnology

Project facts

Canonical nameFivemile Wind
Queue ID27INR0474
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketDawson
TechnologyOther
Capacity282.3 MW
StateTexas
CountyDawson
Point of interconnectionTap 138kV Lamesa 138kv (10008) to Jim Payne 138kV (18880)
Requested (queue) date2025-04-25
Proposed in-service date
Operational date2029-09-23
Withdrawn date
DeveloperLongview Wind, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.