Dawson County, Texas — Interconnection Projects
The interXdata warehouse tracks 18 interconnection projects in Dawson, Texas, representing 3,058 MW of requested capacity.
18Total projects
0Active
14Operational
3Withdrawn
3,058 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 9 | 1,696 MW |
| Other | 7 | 1,051 MW |
| Wind | 1 | 211 MW |
| Battery | 1 | 100 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Green Holly Solar | 21INR0021 | Solar | 413.6 MW | suspended | Dawson, Texas |
| Los Toros Energy Center Solar SLF | 29INR0255 | Solar | 401.6 MW | operational | Dawson, Texas |
| Longview Wind | 26INR0530 | Other | 352.6 MW | operational | Dawson, Texas |
| Fivemile Wind | 27INR0474 | Other | 282.3 MW | operational | Dawson, Texas |
| Red Holly Solar | 21INR0022 | Solar | 260.0 MW | operational | Dawson, Texas |
| Mesquite Creek Windpower Repower | 27INR0501 | Other | 212.9 MW | operational | Dawson, Texas |
| Mesquite Creek Wind | 59332_MSCRK | Wind | 211.2 MW | operational | Dawson, Texas |
| Blackwater Draw Solar | 19INR0115 | Solar | 151.9 MW | withdrawn | Dawson, Texas |
| Gold Creek Solar | 19INR0167 | Solar | 140.0 MW | withdrawn | Dawson, Texas |
| Atascosa I Solar | 20INR0102 | Solar | 126.6 MW | withdrawn | Dawson, Texas |
| Al Pastor BESS | 24INR0273 | Other | 103.1 MW | operational | Dawson, Texas |
| Lamesa Solar | 60372_LSPV1 | Solar | 102.0 MW | operational | Dawson, Texas |
| Al Pastor Battery Storage Plant | 67721_ALPTR | Battery | 100.3 MW | operational | Dawson, Texas |
| Lamesa II | 61697_IVORY | Solar | 50.0 MW | operational | Dawson, Texas |
| Red Holly Storage | 21INR0033 | Other | 50.0 MW | operational | Dawson, Texas |
| Lamesa Solar B (Phase II) IVORY | 16INR0023b | Solar | 50.0 MW | operational | Dawson, Texas |
| Red Holly Storage 1 | 21INR0029 | Other | 50.0 MW | operational | Dawson, Texas |
| Los Toros Energy Center Storage SLF | 29INR0271 | Other | 0.0 MW | operational | Dawson, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| GreenGo Energy | 3 | 360 MW |
| Los Toros Energy Center, LLC | 2 | 402 MW |
| Core Solar SPV I, LLC | 2 | 278 MW |
| Longview Wind, LLC | 2 | 635 MW |
| S&R SOLAR DESIGN CORP | 1 | 140 MW |
| OCI Solar | 1 | 50 MW |
| Mesquite Creek LLC | 1 | 213 MW |
| Copenhagen Infrastructure Partners Fund IV | 1 | 414 MW |
| Al Pastor BESS LLC | 1 | 103 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.