FL Queue Project 027056 — Gas in Volusia, Florida

FL Queue Project 027056 — Gas in Volusia, Florida is a 655.0 MW gas interconnection project in Volusia, Florida with a current status of withdrawn. It is proposed to connect at Debary Substation.

655.0 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 027056 — Gas in Volusia, Florida
Queue ID027056
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyGas
Capacity655.0 MW
StateFlorida
CountyVolusia
Point of interconnectionDebary Substation
Requested (queue) date2016-09-01
Proposed in-service date2021-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.