FL Queue Project 100 — Gas in Polk, Florida

FL Queue Project 100 — Gas in Polk, Florida is a 21.0 MW gas interconnection project in Polk, Florida with a current status of operational. It is proposed to connect at Polk Substation, Polk County, Florida.

21.0 MWCapacity
OperationalStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 100 — Gas in Polk, Florida
Queue ID100
Statusoperational
Source statusInterconnection Agreement Executed
MarketFL
TechnologyGas
Capacity21.0 MW
StateFlorida
CountyPolk
Point of interconnectionPolk Substation, Polk County, Florida
Requested (queue) date2023-03-13
Proposed in-service date
Operational date2024-04-01
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.