FL Queue Project 100 — Gas in Polk, Florida
FL Queue Project 100 — Gas in Polk, Florida is a 21.0 MW gas interconnection project in Polk, Florida with a current status of operational. It is proposed to connect at Polk Substation, Polk County, Florida.
21.0 MWCapacity
OperationalStatus
FLMarket
GasTechnology
Project facts
| Canonical name | FL Queue Project 100 — Gas in Polk, Florida |
|---|---|
| Queue ID | 100 |
| Status | operational |
| Source status | Interconnection Agreement Executed |
| Market | FL |
| Technology | Gas |
| Capacity | 21.0 MW |
| State | Florida |
| County | Polk |
| Point of interconnection | Polk Substation, Polk County, Florida |
| Requested (queue) date | 2023-03-13 |
| Proposed in-service date | — |
| Operational date | 2024-04-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tampa Electric Company |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.