FL Queue Project 124 — Gas in Hillsborough, Florida
FL Queue Project 124 — Gas in Hillsborough, Florida is a 608.0 MW gas interconnection project in Hillsborough, Florida with a current status of active. It is proposed to connect at Big Bend Substation, Hillsborough County, Florida.
608.0 MWCapacity
ActiveStatus
FLMarket
GasTechnology
Project facts
| Canonical name | FL Queue Project 124 — Gas in Hillsborough, Florida |
|---|---|
| Queue ID | 124 |
| Status | active |
| Source status | Cluster Study Underway |
| Market | FL |
| Technology | Gas |
| Capacity | 608.0 MW |
| State | Florida |
| County | Hillsborough |
| Point of interconnection | Big Bend Substation, Hillsborough County, Florida |
| Requested (queue) date | — |
| Proposed in-service date | 2032-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tampa Electric Company |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.