FL Queue Project 125 — Battery in Polk, Florida
FL Queue Project 125 — Battery in Polk, Florida is a 20.0 MW battery interconnection project in Polk, Florida with a current status of active. It is proposed to connect at Lake Gum Substation, Polk County, Florida.
20.0 MWCapacity
ActiveStatus
FLMarket
BatteryTechnology
Project facts
| Canonical name | FL Queue Project 125 — Battery in Polk, Florida |
|---|---|
| Queue ID | 125 |
| Status | active |
| Source status | Cluster Study Underway |
| Market | FL |
| Technology | Battery |
| Capacity | 20.0 MW |
| State | Florida |
| County | Polk |
| Point of interconnection | Lake Gum Substation, Polk County, Florida |
| Requested (queue) date | 2020-04-15 |
| Proposed in-service date | 2028-01-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tampa Electric Company |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.