FL Queue Project 18 — Solar in Hillsborough, Florida

FL Queue Project 18 — Solar in Hillsborough, Florida is a 30.0 MW solar interconnection project in Hillsborough, Florida with a current status of withdrawn. It is proposed to connect at Mulberry Substation, Hillsborough County, Florida.

30.0 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 18 — Solar in Hillsborough, Florida
Queue ID18
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity30.0 MW
StateFlorida
CountyHillsborough
Point of interconnectionMulberry Substation, Hillsborough County, Florida
Requested (queue) date2017-04-19
Proposed in-service date2018-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata