FL Queue Project 21 — Solar in Polk, Florida

FL Queue Project 21 — Solar in Polk, Florida is a 74.5 MW solar interconnection project in Polk, Florida with a current status of withdrawn. It is proposed to connect at Recker Substation, Polk County, Florida.

74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 21 — Solar in Polk, Florida
Queue ID21
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyPolk
Point of interconnectionRecker Substation, Polk County, Florida
Requested (queue) date2017-04-20
Proposed in-service date2019-01-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTampa Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata