FL Queue Project 27 — Solar in Pasco, Florida

FL Queue Project 27 — Solar in Pasco, Florida is a 74.5 MW solar interconnection project in Pasco, Florida with a current status of withdrawn. It is proposed to connect at Handcart Substation, Pasco County, Florida.

74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 27 — Solar in Pasco, Florida
Queue ID27
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyPasco
Point of interconnectionHandcart Substation, Pasco County, Florida
Requested (queue) date2017-04-24
Proposed in-service date2020-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata