FL Queue Project 344 — Solar in Baker, Florida
FL Queue Project 344 — Solar in Baker, Florida is a 74.5 MW solar interconnection project in Baker, Florida with a current status of operational. It is proposed to connect at Duval-Raven 230kV.
74.5 MWCapacity
OperationalStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | FL Queue Project 344 — Solar in Baker, Florida |
|---|---|
| Queue ID | 344 |
| Status | operational |
| Source status | In-Service |
| Market | FL |
| Technology | Solar |
| Capacity | 74.5 MW |
| State | Florida |
| County | Baker |
| Point of interconnection | Duval-Raven 230kV |
| Requested (queue) date | 2018-05-04 |
| Proposed in-service date | — |
| Operational date | 2026-01-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Florida Power & Light |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata